6 Sanitation Biogas Plants in Rohingya Refugee Camp

In this module, you will

  • Gain an insight into the practical operation and performance of sanitation biogas systems in an emergency context
  • Learn about the operational challenges faced and how to address them

In 2019, UPM conducted a comprehensive study in the Rohingya refugee camp to assess the biogas generation of 13 biogas plants connected to toilet blocks consisting of 11 to 22 cubicles.

Toilet Block Connected to Biogas Digester, Refugee Camp Bangladesh (UPM)