Quiz

After reviewing the decision tree, it has been determined that the sludge will be incinerated as there is an available incineration plant including drying beds located just 10km away.

Because the volume digester is 167m3 quite a sludge discharge pipe was considered so that inert sludge from the bottom can be removed without emptying the entire system.